Using the steel girders as lift points, the sneakers begin the raise.
As the sneakers raise the building higher, temporary safety blocks are placed at key points for safety.
The stone slinger distributes new stone under the building.
Pads are placed on the stone, and the building is lowered onto it's new resting place. Note the steel girders still in place.